Home

About

Partners

Contacts

Products
   

Access clear
» Documents

» Work packages

        Work Packages


For an exhaustive and updated deliverable list
please check the project's ftp site

 

WP 1 : Data Management

Ref
 

Title
 

Posted
 

--

Planning of tasks of Workpackage 1 (MW doc.)

21/12/2004

--

Hydrodynamic model data requirements

01/03/2005

D1.1

Data sets with the data already being used in models applied previously - All sites (link to ftp)

13/12/2005

D1.2

Data sets of physical parameters to complete information in hydrodynamic and sediment transport models - All sites (link to ftp)

13/12/2005

D1.3 Data sets of all gathered data of all sites (draft)

04/04/2007

D1.4

Maps of land use and vegetation cover Aysén - Chile

03/10/2005

D1.5

Report on: Maps of landscape descriptions according to different parameters (fractality, connectance, edgediversity etc.)

08/03/2006
D1.6

Report on: Vegetation data tables and graphical description of the vegetation structure along transects (profile diagrams)

08/03/2006
D1.7

Report on: Characterization of vegetation's structure and floristic composition and main types of human disturbance

04/04/2007
D1.8

Description of the vegetation in different stages of secondary succession according to parameters of structure (high, diameter, density, etc) and floristic composition and main types of human disturbance (draft)

04/04/2007

D1.9

Report on socio-economic data sets:
General Introduction
Brazil
Argentina
Chile

07/03/2006

D1.10

Socio-economic prospective data to characterize each site’s development strategies

08/03/2006
D1.11

Database Structure

08/03/2006
D1.12

Aquatic component of database - All sites (link to website)

08/03/2006
D1.13

Land component of database - All sites (link to website)

08/03/2006
WP 2 : Implementation, Improvement & Validation of PHES-System

Ref
 

Title
 

Posted
 

D2.1

Report on the preliminary hydrodynamic model applications for Ecomanage study sites

04/04/2007
D2.2

Preliminary sediment transport model application for Puerto Aysen, Chile (draft)

04/04/2007
D2.6

SIG mapping of hydrogeologic parameters, including groundwater recharge assessment and groundwater vulnerability to pollution: 1st Part: Santos estuary

08/03/2006

D2.9

Preliminary ecological model concept and modelling strategy for EcoManage

13/12/2005

D2.12

Report on the preliminary basin model for EcoManage study sites

26/09/2006

D2.15 Human-ecosystem interactions: Report on methodologies and modeling approaches

01/08/2007

WP 3 : Data Campaigns

Ref
 

Title
 

Posted
 

D3.1 Report on results of the 1st data campaigns in Santos 04/04/2007
D3.2 Report on results of the data campaigns in Santos 04/04/2007
WP 4 : Coastal Zone Management

Ref
 

Title
 

Posted
 

D4.1

Results of the Meeting with Stakeholders of Santos

08/03/2006
D4.3 Results of the Meeting with Stakeholders of Aysén 04/04/2007

D4.6

Preliminary report on: Data exchange criteria, spatial harmonization of modelling work, data formats

03/10/2005
D4.7

Final report on: Data exchange criteria; spatial harmonization of modelling work; data formats (draft)

04/04/2007
D4.14

Report on: Definition of SDSS design after meeting with all partners 

07/03/2006
D4.15 A comprehensive system software tool accessible to the participants of the project for SDSS that integrates: image processing, GIS, multi-criteria analysis, cost benefit assessment, etc. (draft) 04/04/2007
WP 5 : Knowledge Dissemination

Ref
 

Title
 

Posted
 

D5.4

Internet knowlege base structuring (draft)

04/04/2007

  Reports (Miscellanea)

Title
 

Author

Posted
 

First 6 Months Report IST / HIDROMOD (pt)

03/10/2005

Periodic Management Report - 1st year IST / HIDROMOD (pt) 16/03/2006
Periodic Activity Report - 1st year IST / HIDROMOD (pt) 16/03/2006
IO-USP Annual Report IO-USP (br)

19/12/2005